Aluminum Cylinder Tube

FOB Reference Price:Get Latest Price
US $5,000-8,000 / Tons | 2 Ton/Tons for Aluminum Cylinder Tube (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Shanghai, China (Mainland)
Grade:
6000 Series
Shape:
Round
Surface Treatment:
Mill Finished
Outer Diameter:
10-300mm
Length:
100-3000mm
Thickness:
≥0.7mm
Usage:
Industry, Agriculture, Architecture
Hardness:
100HB
Alloy Or Not:
Is Alloy
Temper:
T3 - T8
Al (Min):
Rest
Wall Thickness:
≥0.7mm
Model Number:
K990G
Brand Name:
K&B
Product Name:
Aluminum Cylinder Tube
Anodization film:
20-50um
Cylinder hardness:
8-12
Bending resistance:
110/MPa
Microscopic hardness:
HV200-400kg/m2
Thickness tolerance:
+/-8%
Length tolerance:
+/-3mm
Inner surface roughness:
Ra 0.2-0.4
Inner size tolerance:
H9-10
Alloy temper:
6063-T5
SupplyAbility
SupplyAbility:
50 Ton/Tons per Month for Aluminum Cylinder Tube
Packaging & Delivery
Packaging Details
Standard export seaworthy packing, wood frame package for Aluminum Cylinder Tube.
Port
Shanghai
Lead Time :
Not more than 35 days after received the advanced payment.

Specifications

Aluminum Cylinder Tube
Material: 6061,6063
Dimension: OD:30-500 mm
Tolerance: +/-0.1 mm
Wall thickness :6-15mm, Length:1-6M

Aluminum Cylinder Tube

Chemical Composition

Mg

Si

Fe

Cu

Mn

Cr

Zn

Ti

0.81

0.41

0.23

<0.08

<0.08

<0.04

<0.02

<0.05

Specification

Tension Intensity (N/mm2)

Yield Strength (N/mm2)

Ductility (%)

Surface Hardness

Internal Diameter Accuracy

Internal Roughness

Straightness

Thickness Error

Sb 157

S 0.2 108

S8

HV 400

H9-H11

Ra 0.2-0.4

1/1000

± 1% 

 

 

Specification:

Material: 6063-T5

Pressure >15 mpa

Plating Thickness:35~40um
Internal Roughness:under 3s
I.D Accuracy:H9~H11

Dimension: OD20-500mm

Lenght 1-6 M

As per customer required and drwings

 

ISO 9001 2000 certification, TUV certification

 

Payment and Shipping Terms for Aluminum Cylinder Tube:  

Sample Lead time: 15-18working days include 7-10days making tooling if it's necessary.  

Production lead time: 10-20working days.  

Payment term:  

1. Tooling: 100% prepaid by T/T  

2. Parts: 30% upon order confirmation and balance before delivery by T/T.
3. Other payment terms can be discussed.  

Shipping Term: FOB, CIF or others can be discussed.